How to determine the blasting parameters?

    The determination of the consumption of unit explosives can be determined by reference to the table, combined with engineering analogy and practical experience. After determining the consumption of unit explosives, the total amount of explosives to be used per cycle can be obtained according to the sectional area of ​​the roadway and the footage of each cycle:

    Q=qSLη

    Where: S—well section size, m 2 ;

    L—average blasthole depth, m;

    η—The utilization of the blasthole is generally 80% to 95%.

    q—Unit explosive consumption

      Explosive consumption of tunneling unit ( kg·m - 3 )         

    Excavation sectional area / m 2

    Rock's firmness coefficient

    2~3

    4~6

    8~10

    12~14

    15~20

    <4

    4~6

    6~8

    8~10

    10~12

    12~15

    15~20

    >20

    1.23

    1.05

    0.89

    0.78

    0.72

    0.66

    0.64

    0.60

    1.77

    1.50

    1.28

    1.12

    1.01

    0.92

    0.90

    0.86

    2.48

    2.15

    1.89

    1.69

    1.51

    1.36

    1.31

    1.26

    2.96

    2.64

    2.33

    2.04

    1.90

    1.78

    1.67

    1.62

    3.36

    2.93

    2.59

    2.32

    2.10

    1.97

    1.85

    1.80

    After obtaining the total circulating dose, the dosage is distributed according to the action and conditions of each blasthole in the blasting. Among them, the sulcus is the most important, and the blasting conditions are the worst. More doses should be allocated. The amount of auxiliary eye drops is second, and the distribution of peripheral eye drops is the least.

    The determination of the number of blastholes is mainly related to the roadway section, rock properties, explosive properties and other factors. Generally, the number of eyes is reduced as much as possible while ensuring a reasonable blasting effect.

    The depth of the blasthole is related to the area of ​​the tunneling section, the degree of mechanization of the tunneling and the level of blasting technology. Under the existing conditions, the depth of the blasthole of the monorail canopy is between 1.5 and 2.5 m.

    Construction Protection

    Construction Protection,Pp Corrugated Plastic Floor Protection,Pp Plastic Floor Protection,Corrugated Plastic Floor Protection

    Yixing Guanyu New Materials Co.,Ltd , https://www.maplasticsheetsupply.com

    Previous Post: More Stable and Longer Worklife Two Stage Vacuum Pump
    Next Post: Cooperative disposal with bag dust removal as the core and ultra low emission
    Home
    Recent Posts
    • Aluminum Car Radiator for Toyota Lexus′is250/I…
    • Carbon Black Ash Removal System Carbon Cleaner
    • High Quality Filter for Excavator
    • Ccj8253 Sample Tuff-Koat Alloy Rotavator Blades
    • Cylinder Block for VW 1.9tdi/ 2.0L/ Jv481/ Ajr48…
    • Manufacturing CNC Hardware Machine Parts / Machi…
    • Stainless Steel 304 Accessories for Tank Manhole…
    • [Analysis] Sludge anaerobic technology real digg…
    • How to avoid the failure of the digital display …
    • Yuchai 16VC first shipboard prototype was succes…
    • Combine Harvester Spare Parts of Blade Protector
    • Ox Drawn Farming Plough and Spare Parts
    • Plain Bore Yoke (Vertical Pin Hole)
    • BS25 BS30 Industry Chain Steel Large Roller Doub…
    • Bearings Bearings Tapered Roller Bearing 30206 3…
    • DIN 137b Wave Spring Washer
    • High Precision Computer Electronic Panel Saw
    • China Manufacture Custom Metal Machining Part Ro…
    • The mainland LED factory sits on the big, the LE…
    • Status Quo and Countermeasures of the Management…